Changes to Seismic Safety Law

Alfred E Alquist Hospital Facilities Seismic Safety

California HEALTH AND SAFETY CODE

Division 107 – STATEWIDE HEALTH PLANNING AND DEVELOPMENT
Part 7 – FACILITIES DESIGN REVIEW AND CONSTRUCTION
Chapter 1 – Health Facilities

Article NumberArticle TitleCode Values
Article 1.General Provisions129675-129680
Article 2.Definitions129700-129745
Article 3.General Requirements and Administration129750-129856
Article 4.Special Requirements129875-129905
Article 5.Building Safety Board129925-129960
Article 6.Enforcement129975-129990
Article 7.Penalties129998
Article 8.New State Responsibilities For Seismic Safety in Hospitals130000-130025
Article 9.Hospital Owner Responsibilities130050-130070
California Health and Safety Code

Senate Bill 395 (SB 395)

The Small and Rural Hospital Relief Program Senate Bill 395 (SB 395) (Caballero, Statutes of 2021) was established in state law to provide grants to qualifying facilities for the purpose of advancing a hospital’s effort to bring its buildings into compliance with Health and Safety Code (HSC) §130065. The program is administered by HCAI’s Cal-Mortgage Loan Insurance Program with assistance from the HCAI Office of Statewide Hospital Planning and Development (OSHPD). The purpose of the Small and Rural Hospital Relief Program (SB 395) is to support and enhance the effort of qualifying facilities to preserve access to general acute care for the communities they serve through provision of state grant funding and technical assistance for building seismic safety and resiliency.

Check Eligibility for Small/Rural Hospital Relief Program

Check eligibility and apply for the Small and Rural Hospital Relief Program (SB 395) using the eServices Portal (eSP)

A hospital requesting participation in the Small and Rural Hospital Relief Program (SB 395) must have an approved compliance plan on file with OSHPD that is three years old or less prior to eligibility for a state grant. For program purposes, each participating hospital will submit a compliance plan with the following information:

  1. Facility name and five-digit identification number.
  2. List of all hospital buildings in use at the facility for general acute care that are not in full compliance with HSC §130065 with an inventory of General Acute Care (GAC) services in each affected building.
  3. Proposed Method of Compliance:
    • Retrofit – modify the building in a manner that brings the building up to a performance rating of SPC-4D or SPC-5 and NPC-5.
    • Replace – relocate general acute care services to an existing conforming building.
    • Rebuild – relocate general acute care services to a new SPC-5/NPC-5 building.
  4. If retrofit is the proposed method of compliance, describe the method of improvement for each affected building’s structural (SPC) and non-structural (NPC) performance rating.
  5. Compliance program schedule.
  6. Listing of approved HCAI project numbers for building evaluations, materials testing, and compliance projects related to the improvement plan description.

Submit a Compliance Plan

Compliance plans are submitted to OSHPD’s Seismic Compliance Unit by submitting a no-fee project application through the eServices Portal (eSP)

Assembly Bill 2190 (AB 2190 Extension)

Assembly Bill 2190 (AB 2190): adds Sections 130062 and 130066 to the Health and Safety Code, relating to hospitals.  Assembly Bill 2190 became law on January 1, 2019, and HCAI is accepting seismic compliance extension applications until April 1, 2019.

Assembly Bill 2190 (Chapter 673, Statutes of 2018) requires all hospitals seeking extensions to the January 1, 2020 compliance deadline for Structural Performance Category 1 buildings to submit an application to HCAI by April 1, 2019. The law requires HCAI to grant an additional extension of time to a hospital that is subject to the January 1, 2020, deadline if certain conditions are met. The law authorizes the additional extension until July 1, 2022, if the compliance plan is based upon replacement or retrofit, or up to five years until January 1, 2025 if the compliance plan is for a rebuild.

Hospitals can now apply for a seismic compliance extension under Assembly Bill 2190. One application is required for each seismically separate building.

Documents required for the application process for an extension under AB 2190, are:

  1.  Letter describing the compliance method and the extension date being requested. See Sections (d)(4) and (e)(5) for limit dates. The length of the extension will be based upon a showing by the owner of the facts necessitating the additional time. Documentation of facts necessary in determining the maximum length of the extension shall be submitted with the application.
  2. An extension schedule detailing dates for submission of plans for review, submission of a construction schedule, obtaining a building permit, beginning of construction and completion of construction. See Sections (d)(1) and (e)(1) for limit dates.
  3. A construction schedule, where available, with construction milestones (such as completion of composite wall retrofit, completion of foundation work, completion of steel erection etc.).  Two of such milestones will be identified as major milestones as the basis for determining whether the hospital is making adequate progress towards meeting the seismic compliance deadline (See Sections (d)(2), (e)(2) and (e)(4)).  The construction schedule is required where construction has already started.

Other information required to complete the application process are: the facility number in which the hospital  building for which the extension is being requested is located, the HCAI building number and name, the PIN number of the applicant facility and the construction project number (where the project has already been submitted). See the Facility Detail page to determine the facility and building numbers.

Submit an Application for AB 2190 Extension

Submit an Application for the Assembly Bill 2190 (AB 2190) Extension through eServices Portal (eSP)

Assembly Bill 2190 Quarterly Reports

Health and Safety Code Section 130061 (Assembly Bill 2190, Chapter 673, Statutes of 2018) , a hospital granted an extension pursuant to this section shall provide a quarterly status report to the office, with the first report due on July 1, 2019, and every October 1, January 1, April 1, and July 1 thereafter, until seismic compliance is achieved.

The reporting window for the next quarterly report, due on October 1, will open on September 15th.

Submit an AB 2190 Quarterly Report

Submit an Assembly Bill 2190 (AB 2190) Quarterly Report through eServices Portal (eSP)

Assembly Bill 2190 Report to the Legislature

Health and Safety Code Section 130062 (Assembly Bill 2190, Chapter 673, Statutes of 2018) requires the Department of Health Care Access and Information (HCAI), before June 1, 2019, to provide the Legislature with an inventory of the Structural Performance Category (SPC) of each general acute care hospital building in California. 

Assembly Bill 2190 Attestation

130066. Before January 1, 2020, the owner of an acute care inpatient hospital whose building does not substantially comply with the seismic safety regulations or standards described in Section 130065 shall submit to the office an attestation that the board of directors of that hospital is aware that the hospital building is required to meet the January 1, 2030, deadline for substantial compliance with those regulations and standards.

Attestation are required from acute care inpatient hospitals where buildings are rated SPC 1 or SPC 2; or where the NPC rating is less than 5.  Attestation are not required from Acute Psychiatric, Skilled Nursing and Intermediate Care Facilities.

HCAI will accept one letter, which identifies the building(s) that are not in substantial compliance, for each campus as meeting these requirements.  If a healthcare system wants to submit one letter for all the hospitals for which they are the governing authority, they need to specify which hospitals and which building(s) at each hospital that are not in substantial compliance, the letter is intended to cover.  HCAI will duplicate and apply to each campus that is detailed in the letter.

No application is required to submit the attestation letter, simply click on the button below to email the document to the Seismic Compliance Unit. Please include the facility name and five-digit HCAI facility ID number in the letter.

Submit an AB 2190 Attestation

Submit an Assembly Bill 2190 (AB 2190) Attestation by Email

Senate Bill 90 (SB 90)

Senate Bill 90 (SB 90) (Chapter 19, Statutes of 2011): Amends Section 130060 of the Health and Safety Code.

On Friday, June 22, 2012, the Centers for Medicare and Medicaid Services approved the Hospital Quality Assurance Fee (HQAF) Program authorized by Senate Bill (SB) 335, (Chapter 286, Statutes of 2011). Federal approval of the HQAF Program enacts the seismic provision in Health and Safety Code 130060 as amended by SB 90 (Chapter 19, Statutes of 2011).

SB 90 allows a hospital to seek an extension for seismic compliance for its SPC-1 buildings up to seven years based on three elements:

  1. The structural integrity of the building.
  2. The loss of essential hospital services to the community if the hospital is closed.
  3. Financial hardship.

HCAI submitted proposed regulations to the Building Standards Commission (BSC) to implement the provisions of SB 90 as Emergency Regulations. The regulations have been approved by the BSC and are enforceable.  These are published in the California Administrative Code, Chapter 6.

2020 Seismic Safety Extension (SB 306 Extension)

The 2020 Seismic Safety Extension Senate Bill 306 (SB 306) allows city or county hospitals or hospitals that meet strict financial hardship criteria to receive a seven year extension from the 2013 seismic safety deadlines and instead require the hospitals to replace those buildings by 2020.

The Alfred E. Alquist Hospital Facilities Seismic Safety Act of 1983 (California Health & Safety Code § 129675, et seq.), establishes, under the jurisdiction of the Department of Health Care Access and Information, a program of seismic safety building standards for certain hospitals constructed on and after March 7, 1973. In 2007, Senate Bill 306 (SB 306) added Health & Safety Code §130061.5, which authorizes qualified hospital owners, including city or county hospitals or hospitals that meet strict financial hardship criteria, to receive a seven year extension from the 2013 seismic safety deadline and instead require the hospitals to replace those buildings by January 1, 2020.

Health & Safety Code §130061.5 specifies several different requirements that must be met for a hospital to receive relief from the retrofit or rebuilding deadlines of 2008 and 2013. 

The conditions applicants must meet for the 2020 extension are located in the provisions of Health and Safety Code §130061.5

Senate Bill 499 (SB 499)

Senate Bill 499 (SB 499) (Chapter 601, Statutes of 2009): Amends Sections 130060 & 130061 and added Section 130022 to the Health and Safety Code.

Senate Bill 499 (SB 499) required all general acute care hospitals that have Structural Performance Category 1 (SPC-1) buildings to report to the Department of Health Care Access and Information by November 1, 2010, and annually thereafter, on the status of their compliance with the seismic safety deadlines. This information is necessary to measure the level of seismic safety compliance being achieved by California′s hospitals. The ultimate goal being that Californians will have safer hospital buildings without jeopardizing their access to health care.

SB499 Reports:

For questions or comments related to the SB499 reports, please email the Seismic Compliance Unit.

(c) An owner of a general acute care hospital building that is classified as a nonconforming Structural Performance Category-1 (SPC-1) building, shall submit a report to the office no later than November 1, 2010, describing the status of each building in complying with the requirements of Section 130060, and annually thereafter shall update the office with any changes or adjustments. The report shall identify at least all of the following:

  1. For each building that is subject to subdivision (a) of Section 130060 that is planned for retrofit or replacement,the report shall identify:
    1. Whether the hospital owner intends to retrofit or replace the building to SPC-2, SPC-3, SPC-4, or SPC-5.
    2. The deadline, as described in Section 130060 or 130061.5, for retrofit or replacement of the building that the hospital owner intends to meet, and the applicable extension for which the hospital owner has been approved.
    3. The project number or numbers for retrofit or replacement of each building.
    4. The projected construction start date or dates and projected construction completion date or dates.
    5. The most recent project status and approvals.
    6. The number of inpatient beds and patient days, by type of unit and type of service to be provided.
  2. For the building or buildings to be removed from acute care service, the following information shall be included:
    1. The projected date or dates the building will be removed from service.
    2. The planned uses of the building or buildings to be removed from acute care service.
    3. The inpatient services currently delivered in the building or buildings.
    4. The number of inpatient beds and patient days, by type of unit and type of service, for the years 2008, 2009, and 2010.
    5. Whether the general acute care services and beds will be relocated to a new or retrofitted building and any corresponding building sites or project numbers.
  3. Each hospital owner shall also report, for each facility for which any buildings will be removed from acute care service, any net change in the number of inpatient beds, by type of unit and type of service, taking into account beds provided in buildings to be taken out of service, beds provided in buildings to be retrofitted or replaced, and beds provided in any other buildings used for general acute care inpatient services by the facility.
  4. Each hospital owner shall report any general acute care hospital inpatient service that is provided in any general acute care hospital building that is rated SPC-1.
  5. Each hospital owner shall report the final configuration of all buildings on its campus showing how each building will comply with the SPC-5/NPC-4 or 5 requirements, whether by retrofit or by replacement, and the type of services that will be provided in each general acute care hospital building.

(e) The office shall make the information required by Subdivision (c) available on its Internet web site within 90 days of receipt of this information. The office shall include the hospital name, hospital owners, and location of the buildings included in the report, and, to the extent possible, for service areas containing buildings for which hospital owners report information pursuant to subdivision (c), include information on the number of inpatient beds, by type of unit and type of service, provided by facilities operating buildings that are classified as SPC-2, SPC-3, SPC-4, and SPC-5.

Senate Bill 1661 (SB 1661)

Senate Bill 1661 (SB 1661) (Chapter 679, Statutes of 2006): Amends Section 130060 & 130061 of the Health and Safety Code.

Senate Bill 1661 required all general acute care hospitals that have SPC-1 buildings to report to the Department of Health Care Access and Information by June 30, 2009, on the status of their compliance with the seismic safety deadlines.  This information is necessary for the legislature to understand the level of compliance being achieved by California’s hospitals, the potential impact to Californian’s access to health care and whether a need exists to address the issues, if any, with a statewide policy solution. The ultimate goal being that Californian’s will have safer hospital buildings without jeopardizing their access to health care.

Per SB 1661 Health and Safety Code Section 130061 – Two reports were submitted:
  1. April 15, 2007
  2. June 30, 2009 

These reports are superseded by subsequent SB 499 reports. They have been archived and are available on request. 

Other Legislative Changes


For questions or comments related to the legislative changes, please email the Seismic Compliance Unit.